Dodge Flats

Washoe County, NV

ECI’s BESS work scope connects to a 200 MW solar field and includes 50 MW of battery storage. The BESS consists of Sabre containers with Samsung lithium ion batteries; inverters are Power Electronics 3.55 MVA. ECI was responsible for the BESS yard layout, electrical studies, complete civil, electrical and P&C engineering as well as relay settings.

ECI also provided all electrical, civil and structural engineering design services to NextEra’s 345-34.5 kV Dodge Flat Collection Substation. The substation involved one 345 kV circuit breaker, three 345 kV arresters, twenty four 34.5 kV hook switches, and three circuit breakers.

ECI’s BESS scope of services included BESS System Integration, SCADA / Control / Communication Design, Structural Design, General Arrangement, Medium Voltage Design and Protection, Grounding and Surge Protection Design, Schematic and Wiring Design, and NERC CIP assessment. ECI is currently proving the BESS AC augmentation for Dodge Flats.

  • ECI’s BESS scope of services included:
    • BESS System Integration
    • SCADA / Control / Communication Design
    • Structural Design
    • General Arrangement
    • Medium Voltage Design and Protection
    • Grounding and Surge Protection Design
    • Schematic and Wiring Design
    • NERC CIP assessment
  • Key facts and highlights:
    • a 50MW/200 MWh BESS system
    • Power Electronics 3.55 MVA Inverters
    • Samsung lithium ion batteries