ECI’s BESS work scope connects to a 200 MW solar field and includes 50 MW of battery storage.
The BESS consists of Sabre containers with Samsung lithium ion batteries; inverters are Power Electronics 3.55 MVA. ECI was responsible for the BESS yard layout, electrical studies, complete civil, electrical and P&C engineering as well as relay settings.
ECI also provided all electrical, civil and structural engineering design services to NextEra’s 345-34.5 kV Dodge Flat Collection Substation. The substation involved one 345 kV circuit breaker, three 345 kV arresters, twenty four 34.5 kV hook switches, and three circuit breakers.
ECI’s BESS scope of services included: