Navajo Indian Irrigation District Condition Assessment Project

Farmington, NM, USA


Power System Studies & Planning

ECI provided an engineering evaluation and inspection report for the Navajo Agricultural Products Industry’s Facility 1 and Facility 2. The Navaho Irrigation Project (NIIP) includes 4 major pump stations and numerous smaller pump sites.  This assessment of the electrical system motor also included the associated Motor Control Centers MCC, the incoming switch gear, grounding, cathodic protection, motors and arc flash labeling. ECI’s inspections found that several arch flash labels were missing, there was poor grounding, and several of the control relays and dash pots needed replacing. Additionally, MCCs needed replacement as the control section and breaker section were made with no barrier between them. ECI then provided a facility rehabilitation plan and estimated cost guide.



x
  • Hidden
  • This field is for validation purposes and should be left unchanged.

LET’s BUILD SOMETHING GREAT

Are you in need of planning, conceptual design, detailed engineering, or a full turn-key project? Let our ECI team provide a comprehensive scope of services and cost for your upcoming project.

GET IN TOUCH