ECI’s engineering team provided design for the 34.5-345 kV substation and its associated 50 MW/75 MWh BESS facilities.  The substation consists of (2) 34.5 kV feeder positions, (1) 34.5-345 kV main power transformer and (1) 345 kV breaker, the BESS is a lithium type manufactured by Sungrow. EPCS was the overall BOP Contractor for these facilities.