Station 38 Protection and Integration

Monroe County, NY, USA


Power System Integration & SCADA Engineering, Power System Protection Engineering

ECI was responsible for relay settings and automation for a phased refurbishment of Station 38, which is a major distribution station in the heart of Rochester, New York. At the final phase of the project, the station will have approximately (100) new Protection & Automation IEDs installed.

ECI was responsible for developing the System Automation Platform using CIMPLICITY for the Station HMI, and (3) SEL-3350 RTACs for the RTU. ECI engineers were responsible for coordinating the development of all P&C settings, A&I programming and leading all onsite commissioning efforts. This effort required seven phases of work to complete as the new equipment needed to be installed and commissioned at an indoor substation that needed to remain in service for most of the project.

Scope of work included Station CIMPLICITY HMI user interface & SEL-RTAC Remote Terminal Unit; IEC-61850 Protection & Integration Settings; SCADA & IED/PED Data Point Maps and Engineering & Commissioning Services.



x
  • Hidden
  • This field is for validation purposes and should be left unchanged.

LET’s BUILD SOMETHING GREAT

Are you in need of planning, conceptual design, detailed engineering, or a full turn-key project? Let our ECI team provide a comprehensive scope of services and cost for your upcoming project.

GET IN TOUCH