Colonial Trail Solar

Surry County, VA

ECI/EPCS is responsible for the design, procurement and construction of the new Colonial Trail 230/34.5 kV collection Substation. Colonial Trail Substation is a new distribution station with three feeders. ECI performed design for the substation and all applicable studies to include: grounding, lightning protection, load flow, reactive study, harmonics study, fault study etc. Construction on Colonial Trail is on-going.

Based on performance on Colonial Trail, EPCS/ECI was awarded two additional Dominion projects, which were running behind schedule. A comment received from Dominion was that they were very happy with ECI and felt the design was very professional at Colonial Trail. The award of these projects is a testament to the professionalism and diligence ECI/EPCS extends to all clients.

SERVICES

, , , , , ,

COMPANY

,

let’s build something great

Are you in need of planning, conceptual design, detailed engineering, or a full turn-key project? Let our ECI team provide a comprehensive scope of services and cost for your upcoming project.