Mechanicville Obermeyer Dam Logic Review

Saratoga County, NY

ECI was hired to review the PLC logic at the Mechanicville Obermeyer Dam to correct problems with position cycling. 

We will conduct a review the Station Drawings, Operating Manual and PLC Logic. Our evaluation will include recommendations for upgrades that can improve reliability & maintainability.  Based on these results a decision will be made to proceed with upgrading to a new system or attempting to fix problems with the existing system. Our team will optimize the existing code to correct issues with position cycling. Lastly, we will train NYSEG staff in the use of PLC programming software.

  • Key Facts and Highlights:
    • PLC
    • Automation

SERVICES

, , ,

COMPANY

let’s build something great

Are you in need of planning, conceptual design, detailed engineering, or a full turn-key project? Let our ECI team provide a comprehensive scope of services and cost for your upcoming project.